Popped the butt pad off a T3X to see what is what to install QD sling swivel sockets, looks fairly straightforward, lots of room on the forend. I would have finished it today, but, need to go to town to get some steel bed epoxy. Mine dried up, hard like rock.
Considered loading some 6.5cm with Accubonds.
Had plans to go shoot this AM, wind kiboshed that.
Ordered a Forster 3way cutter head for 6.5.
__________________
You should also be a member;
CCFR
CSSA
|